Thursday, October 29, 2026

SAVE THE DATE! SAVE THE DATE! DECEMBER 5, 2026

The Windswept Board of Directors invites all owners to attend a Town Hall on SATURDAY, DECEMBER 5, 2026.

Lakeside Room, 10:00 AM - 12:00 PM

The Windswept Board of Directors will stage a Town Hall.

The purpose will be to provide owners who could not attend the October 25 Town Hall with a summary of the October 25 presentation and to provide all owners with a status update. 

At the informative session, the issues affecting Building 5 and other buildings will be presented as follows:

  • ~ Brief history of events
  • ~ What is happening now
  • ~ Upcoming possibilities



Tuesday, October 27, 2026

Annual Fire Inspection: November 9 - November 20, 2026

Special Newsletter: Fire System Inspection Notice

·      CLICK HERE for printable notice

The Annual Fire system inspection has been scheduled for November 9 starting at 9AM, through November 20 by ARK, our service provider, with assistance from PCAM and the Association. This is a requirement of the NFPA and local fire safety code.

·       Your cooperation and patience is appreciated.

·       What will be inspected?

o   The following will be tested and/or inspected; 
-      Sprinklers (some in closets)
-      Fire Alarms
-      Backflow
-      Fire Extinguishers
-      Fire Pumps
-      Emergency Lights

·       The inspection requires that every sounder/strobe is checked for proper operation.

·       Upon entry of every unit, the inspection team inspects every sprinkler head.

·       Sprinkler heads are located throughout our units. Every room and large closet has one.

·       Sprinkler head concealers are sometimes painted and caulked. This is a violation of the fire code as paint, spackling, and caulk affect the concealer cap from separating in the event of a fire. Seventy (70) sprinkler concealer caps were adulterated and replaced by ARK technicians in 2026. The Association pays for the replacements. This year the Association will back-charge owners for replacement concealer caps.

·       175 of 177 have provided keys or codes. Thank you for your cooperation.

·       ARK will be providing a “Deficiency Report” for the Association to develop an Action Plan.

·       The Association will inspect units for expired smoke alarms. Those unit owners will be cited and asked to replace the expired smoke alarms. Many are twenty-years old.

2027 – Inspections

The following inspections do not require unit access.

February - Quarterly Sprinkler Inspection

May– Semi-Annual Sprinkler Inspection

August– Quarterly Sprinkler Inspection

November (excluding weekend) – Annual Inspection –

 Do you know where the fires extinguishers for the common areas are located?

 Do you know where the alarm pull-boxes are located?

 Do you have a fire extinguisher in your condo?


Fire Alarm Pull Box

Common Area Fire Extingusher


Monday, October 19, 2026

October 2026 Energy Report

Electricity Savings

Our investments and management efforts are paying off. We are hopeful that more efficiency will be realized during the heating months. 

  • Thermostats in the data and sprinkler closets will be set to 55 degf.
  • Lobby thermostats will be set to 60 degf.
October 2026= $898.55 less compared to October 2025.
Year to Date Savings= $13,929,79
Actual versed budget YTD is $19,210,07 below YTD budget, 30.1% below budget.






Windswept Notices October - November 2026

TOWN HALL
The Board will host a Town Hall meeting at 1:00 pm at the Lakeside room on Sunday, October 25th. During this meeting, the Board will share with the community the results of the October 12th inspections of Building 5, and answer owner questions. If you cannot attend in person, please use the Team's link below.

Meeting Link: Join:
https://teams.microsoft.com/meet/2682222668531668?p=Xzn5oHMDRRGUOl1QPy

~~~~~~~~~~~~~~

Windswept Condominium Association

Notice of Annual Meeting

Dear Windswept Community,

The Board of Directors will host the 2026 Annual meeting on Sunday, November 15th at the Lakeside Room. The meeting will begin promptly at 1:00 p.m.

Included with this notice:

· Call for Nominations

· Voting Information

· Meeting Agenda

· 2025 Annual Meeting Minutes

· 2027 Budget

~~~~~~~~~~~~~~~~~~~~~~~~~~~~

NOMINATIONS 

The Windswept COA hereby makes a call for nominations for candidates to run for the (2) open seats on the Board of Directors. If you would like to nominate yourself, you should present a resume along with this form. All resumes will be distributed prior to the Election. All nominations must be received on or before the close of business, Friday October 30th, 2026, to be included on the proxy and the ballot, which will be distributed on November 2nd.






Thursday, October 8, 2026

Results of Electric Vehicle Survey


86 of 177 responded. 

At this time, an EV charging station doesn't appear to useful.
No full time resident of Windswept has an EV.

Even if the demand was greater, the Association would not finance the project.

Response CategoryCountPercentage
No, I do not have an EV6980.2%
Yes, have an EV & reside in Windswept >4 months/year55.8%
Plan to purchase an EV in the next 12 months44.7%
Own a rechargeable hybrid vehicle (PHEV)22.3%
Yes, have an EV but only occasionally visit Windswept22.3%
Other / Custom Responses (see details below)44.7%
Total86100.0%

Wednesday, October 7, 2026

Friday, October 2, 2026

What About Electric Vehicles?

Several Windswept Owners have inquired about EV charging stations.

First Questions: 

A survey questionnaire has been sent to all owners on this subject.

  1. Do you own an electric vehicle that requires charging?
  2. Do you plan to purchase an EV in the next 6 months?
  3. If yes, are you a full-time resident at Windswept?
The Infrastructure Committee will be researching the feasibility of charging stations here at Windswept.  This is a multifaceted issue. Just to name few: location, costs, grants available, type of chargers, who will own it? Power required. Do we even need it?

 


Thursday, September 24, 2026

PROGRESS on PERGOLAS!

Work has begun on the pergolas.
They will all be reconstructed by Resort Exteriors.
The construction will feature PVC and Vinyl covering.
Wood is used for structural purposes.
No wood will be exposed after completion.

Building 10 should be completed by Friday.
Buildings 9,10, & 11 have been started.

Unit 10101







Saturday, September 12, 2026

STILL SAVING!

 Year-Over- Year Electric Billing Savings, September 12, 2026

Cumulative Savings = $13,031.24




Wednesday, September 9, 2026

Who will step up?

 NOTICE!

On Sunday, November 15, 
Windswept Condominium Association will conduct its 

Annual Meeting of Owners

At the meeting directors will be elected.
Two director positions will be open.
It is time to prepare your resume. 
The term is for three years.

This is your chance to get things done!




Monday, August 31, 2026

What if I am locked out?

I am locked out and have no key!

I have heard this several times. That's condo normal.

Here a few ways to keep this frustrating moment from happening. 

Get a lock box. These are great especially if you are away and need to allow someone entry. Amazon has several models, $15-$30.

Two types: Wall mount and Doorknob hanger. You can buy these at Amazon. Some folks hang the hanger type on their storage closet.

Write the combination down in a place that you will remember.





Get a magnetic "Hide-A-Key". Put your house key in it and attach it under your car. (not in your car.) or some other hiding spot. 
Find a trustworthy full-time neighbor. 

Any other ideas?




Sunday, August 30, 2026

How about those Keys?

Dear Neighbors,

As you know, the Association has been asking for unit keys for the past two years. I want to thank all of you that have responded.  We started last year with 45 missing keys. As of August 29, we only need 7 more unit keys to be 100% compliant.

If you have not been contacted, you may assume that there is a key for your unit in the lockbox.

Why do we need your keys? There are two basic reasons.

Emergency access: Medical access or equipment failure. There have been three incidents of water damage in the past two years when management could not access units where a water was flowing out of control. Simply put, no one was home and no key was in the lockbox.

Inspections: Every year in November, an annual fire inspection is conducted. The inspection requires access to every unit. Strobe/sounders and all sprinkler heads are checked. Units that are inaccessible are listed in a deficiency report. The Association pays for return visits to all inaccessible units.

How are the keys secured?

Each building has a lockbox in a closet with a dead bolt. They are now stored in an orderly fashion and tagged. These lockboxes have been recently organized to reduce the possibility of loss.

BEFORE


AFTER organized by floor


submitted by George Breig






Monday, August 24, 2026

Are you set up to pay your condo fees?

October 1 is approaching.

Don't play "Beat the Clock" with your assessment payment.

Have you set up your account with Premier Management?

This is the link, https://home.pcam.net/public 

  1. Set up your login. Use Email address
  2. Use the sign-up link if you haven't already established a login.
  3. You can set up autopay (automatic recurring payments) directly in your Vantaca Home portal. Here’s how to do it:  AutoPay will pay your bill when it is due and adjust the amount if the assessment changes.  (Recurring payment will not adjust.)

How to Set Up Autopay

1. From Home**, click on **Payments** in the left menu.

2. In the Payments section, look for options like

**Auto-Draft**, **Recurring Payment**, or **Set Up Autopay**.

3. Follow the prompts to:

   - Add your preferred payment method (bank account or credit/debit card)

   - Choose the amount and frequency (usually monthly or quarterly)

   - Confirm and save your autopay settings

 **Important Tips:**

- Make sure your payment method is up to date to avoid missed payments.

- You can review, edit, or cancel your autopay settings anytime from the same Payments section.

Checks for your association should be made payable to:

Windswept Condominium Association 

c/o Premier Community Association Management, LLC

and mailed to: PO Box 97972,  Las Vegas, NV 89193-7972

Be sure to include your account number on the check for proper credit.

If you have any trouble setting this up, contact PCAM. 

Need Assistance?

Our team is here to help. Please contact Premier Community Association Management using the information below.

Phone: 302-644-2752

Matthew Yakshe Email: myakshe@pcam.net


Saturday, August 22, 2026

NOT RECYCLE!

Nice Try.  

NO PLASTIC bags in the recycle bin. Empty the bag. 

The plastic bag goes into the trash dumpster.

Recycle poster


Sunday, August 16, 2026

Are you protected from Fire?

Expired Smoke Alarms

Smoke alarms save lives. Protect yourself and your neighbors.

Several owners have still not replaced their EXPIRED smoke alarms. 

During our November Fire inspection, Unit Owners will be cited for non-code compliant smoke alarms. The current code also requires Carbon Monoxide Sensors.

This is what a non-compliant smoke alarm looks like. They have a 9-volt battery compartment. The newer smoke alarm units have a 10-year battery and do not have a sliding cover. If you remove the alarm device, you will see its date stamp.

The Firex smoke alarm shown is stamped "2006 SEP 18".




9 volt battery compartment on Expired Smoke Alarm

Most Electricians are familiar with the Current Code and make certain of compliance. 

Wednesday, August 12, 2026

The Money Saving Trend Continues. CHA-CHA- CHING!

 Windswept Electric bills continue going down. 

Year -over- Year savings = $12,606.46

WHY?

~ Monthly review of consumption = looking for anomalies

~ Thermostat control of setpoints -(Cooling 76 degrees)

~ Elevator Operation change - Holding last floor- click here for more

~ Improved heating thermostat controls in the Data Rooms and Sprinkler Closets - Effective starting in November







Thursday, August 6, 2026

Going Down? Going Up?

 Elevator Operation: Our elevators used to return to the lobby level after each assent. Most of the electric demand is for powering the lift. A valve opens to bleed the hydraulic fluid. So, "going down" is virtually a free ride.

On May 13, our elevator technician modified the sequential programs. The change will cause the elevator to stay at the floor last serviced. The cab will not return to the lobby unless called. This change has saved electricity by eliminating unnecessary ascents. Most residents say elevator waiting times have been reduced. 

Cha-Ching!




Energy Management, Utility Closet Thermostats, Cha-Ching!



Many owners are unaware of our Utility Closets.
Each building has 4 closets.
  • Sprinkler Room
  • Data Room
  • Elevator
  • HVAC
The Sprinkler Rooms and Data Rooms are heated with electric baseboards. Each house water pipes. The electric baseboards had insufficient controls, thusly overheating the closets.
Critical Peake' electricians installed 23 thermostats on Wednesday, August 6.


New Thermostat connected to baseboard




High-Low Thermometer

Two for each building plus one for the Pump House.
This should positively impact our electric cost during the heating months. 
The T-stats are set to 45 degrees. This will protect the water pipes and electronic equipment in the rooms without wastefully overheating.
Several High-Low Thermometers are in place to monitor temperatures.

Cha-Ching!

The financial benefits should begin to show in November.