October 2026 Energy Report

Electricity Savings

Our investments and management efforts are paying off. We are hopeful that more efficiency will be realized during the heating months. 

  • Thermostats in the data and sprinkler closets will be set to 55 degf.
  • Lobby thermostats will be set to 60 degf.
October 2026= $898.55 less compared to October 2025.
Year to Date Savings= $13,929,79
Actual versed budget YTD is $19,210,07 below YTD budget, 30.1% below budget.






Saturday, September 12, 2026

STILL SAVING!

 Year-Over- Year Electric Billing Savings, September 12, 2026

Cumulative Savings = $13,031.24




Wednesday, August 12, 2026

The Money Saving Trend Continues. CHA-CHA- CHING!

 Windswept Electric bills continue going down. 

Year -over- Year savings = $12,606.46

WHY?

~ Monthly review of consumption = looking for anomalies

~ Thermostat control of setpoints -(Cooling 76 degrees)

~ Elevator Operation change - Holding last floor- click here for more

~ Improved heating thermostat controls in the Data Rooms and Sprinkler Closets - Effective starting in November







Thursday, August 6, 2026

Going Down? Going Up?

 Elevator Operation: Our elevators used to return to the lobby level after each assent. Most of the electric demand is for powering the lift. A valve opens to bleed the hydraulic fluid. So, "going down" is virtually a free ride.

On May 13, our elevator technician modified the sequential programs. The change will cause the elevator to stay at the floor last serviced. The cab will not return to the lobby unless called. This change has saved electricity by eliminating unnecessary ascents. Most residents say elevator waiting times have been reduced. 

Cha-Ching!




Energy Management, Utility Closet Thermostats, Cha-Ching!



Many owners are unaware of our Utility Closets.
Each building has 4 closets.
  • Sprinkler Room
  • Data Room
  • Elevator
  • HVAC
The Sprinkler Rooms and Data Rooms are heated with electric baseboards. Each house water pipes. The electric baseboards had insufficient controls, thusly overheating the closets.
Critical Peake' electricians installed 23 thermostats on Wednesday, August 6.


New Thermostat connected to baseboard




High-Low Thermometer

Two for each building plus one for the Pump House.
This should positively impact our electric cost during the heating months. 
The T-stats are set to 45 degrees. This will protect the water pipes and electronic equipment in the rooms without wastefully overheating.
Several High-Low Thermometers are in place to monitor temperatures.

Cha-Ching!

The financial benefits should begin to show in November.



Tuesday, July 14, 2026

Electric Consumption Report, July14, 2026

Windswept Year-over-Year Comparison

Today DEC issued the monthly bills.

We continue to save money Year-over-Year.

This month was $1,230.69 less than July 2025.

Cumulative savings for 2026 equals $11,786.57

Buildings 3,4 5,6, & 8, show lighting savings.





Saturday, June 13, 2026

Electric Consumption Report, June13, 2026

Year-over-Year Comparison of Electric Billings.

Summary: June’s billing is the first to show the results of the garage lighting improvement installations. Starting on May 1, garages 3,4,5,6, and 8 were upgraded to motion sensing fixtures.  June billing started on May 13. The average YOY saving attributed to lighting consumption of the five buildings was approximately $100 - $130 per building which is in range of expectations. 

Notes: Building 7 was not upgraded since LED fixtures were installed in 2024. Building 8’s equipment problem skewed the 2025 billings. These costs were excluded in the lighting consumption calculations.

Cooler temperatures also reduced air conditioning electric consumption.

Cumulative electric billed cost reflected a YOY cumulative reduction of $10,537.88. (25%)





Submitted by George Breig, WCA Secretary.               June 13, 2026


Friday, May 15, 2026

Windswept Energy Report - DEC billings as of May 15, 2026

A quick look at Building 6 after lighting installation.

A full audit will folllow after the Mid-June billings

Delaware Co-op Electric

Year over Year Billings for April & May. Cumulative savings this year = $9135


Note: Building 8 had an equipment problem In 2025 which added to cost.
We are working on some more energy saving projects.

Friday, May 8, 2026

Garage Lighting Project - Complete

Dear Neighbors,

First, Many thanks to all of you for moving your vehicles. That made work easier and faster.

At last, those 20-year-old rusty, bug encrusted with cracked plastic fixtures have been replaced.

The full-time residents can instantly see the improvement. 

More lights less wattage. Whatta deal!

Building 3,4,5,6, & 8 are complete.

The basic lighting scheme is motion sensing,

which will save money since their "burn time" is only minutes per day. 

8-9 courtesy lights will remain on all night.  

The trash rooms have also been improved.


Building 4 - Standby Night Lights only


Building 4- After driving through fully illuminated

Building 4- electrical consumption, Note change on May 2.
The demands spikes are caused by the elevator.



Sunday, April 26, 2026

Garage Lighting, Building 3, 4 ,5, 6, and 8

Our electrical contractor, Critical Peake, will be on-site to install new garage ceiling fixtures.  On Wednesday, April 27, 2026, they will start in Building 4. Building 3 will follow.

Installations will continue throughout the month of May.

Notices will placed in each building a few days before work begins. Automobiles need to be moved outside during the installation.

The new fixtures will be motion sensing. This featrure will save much money on our electric bills.

Learn More




Friday, April 17, 2026

April Electric Billing Report

These tables and chart compares Year-over-Year electric bills for 2025 and 2026.

Bottom line: the cumulative billed cost reduction was $7995.98.

 Click here for a printable version of the report.